research on safety influencing factors of prefabricated building hoisting construction based on dematel-aism method
首发时间:2024-06-27
abstract:to solve the common problems of lack of safety risk assessment system and unclear evolutionary path for prefabricated building hoisting construction, and to improve the scientific management level of construction safety, an improved the decision making trial and evaluation laboratory - the adversarial interpretation structure modeling (dematel-aism) method for key risk identification and evolutionary path analysis has been proposed. this paper analyzes the factors affecting the construction safety of prefabricated buildings ,and visually analyzes the main factors affecting the construction of prefabricated buildings, and points out the mutual influence and logical relationship between the system factors in the construction of prefabricated buildings, which provides a reference for improving the construction safety management level of prefabricated buildings.
keywords:
点击查看论文中文信息
基于dematel-aism法的装配式建筑吊装施工安全影响因素研究
摘要:为解决装配式建筑吊装施工普遍存在的安全风险评估体系缺失、演化路径不清晰的共性问题,提高施工安全科学管理水平,提出了一种基于改进的决策试验与评估实验室--对抗解释结构建模(dematel-aism)的关键风险识别与演化路径分析方法。本文分析了影响装配式建筑施工安全的因素,直观地分析了影响装配式建筑施工的主要因素,指出了装配式建筑施工中各系统因素之间的相互影响和逻辑关系,为提高装配式建筑的施工安全管理水平提供了参考。
关键词:
基金:
论文图表:
引用
导出参考文献
no.****
动态公开评议
共计0人参与
勘误表
基于dematel-aism法的装配式建筑吊装施工安全影响因素研究
评论
全部评论